随着非洲基础设施建设的加速,对高性能且经济实惠的工程机械需求不断增加。上海挖百万二手挖掘机市场为满足非洲市场的需求,提供了一系列专业的设备解决方案。在最近的一次交易中,我们成功将一台二手卡特320挖掘机出口至非洲,并通过拆卸大小臂的方式显著节省了客户的运输成本。
As infrastructure development accelerates in Africa, the demand for high-performance yet cost-effective construction machinery continues to rise. To meet the needs of the African market, Shanghai Wabaiwan Used Excavator Market offers a range of professional equipment solutions. In a recent transaction, we successfully exported a used Caterpillar 320 excavator to Africa and significantly reduced the client’s shipping costs by dismantling the boom and arm.
在国际运输中,尤其是出口至非洲的过程中,运输成本往往是客户最关心的问题之一。为了有效利用运输空间并降低整体运输费用,我们建议在运输前对大型设备如卡特320挖掘机进行适当的拆卸处理。拆卸大小臂不仅能使设备更容易装入集装箱或平板车,还能减少设备的总体积,从而节省高昂的运输费用。
In international shipping, especially when exporting to Africa, shipping costs are often one of the client’s primary concerns. To efficiently utilize shipping space and reduce overall transportation expenses, we recommend appropriately dismantling large equipment such as the Caterpillar 320 excavator before shipping. Dismantling the boom and arm not only makes the equipment easier to load into containers or flatbed trucks but also reduces the overall volume of the equipment, thereby saving on costly shipping fees.
拆卸过程需要高水平的专业技术,以确保设备在拆卸和运输过程中不受损害。我们的技术团队对卡特320挖掘机进行以下步骤的操作:
精密拆卸
我们的技术人员按照制造商的标准和规定,精确拆卸大小臂,确保在重新组装时能够无缝衔接,保持设备的完整性和功能性。
安全包装与固定
拆卸下来的部件会被仔细包装,并使用专业的固定装置确保在运输过程中不会移动或受到损坏。我们使用防护材料包裹这些部件,以防止任何可能的磕碰或刮伤。
高效装车与运输
在拆卸完成后,我们将设备和拆卸下来的部件安全装载到集装箱或平板车上,准备发往非洲目的地。整个过程在严格的安全标准下进行,确保设备在运输途中的稳定性和安全性。
The dismantling process requires a high level of professional expertise to ensure that the equipment is not damaged during dismantling and transportation. Our technical team follows these steps for handling the Caterpillar 320 excavator:
Precision Dismantling
Our technicians carefully dismantle the boom and arm according to the manufacturer’s standards and specifications, ensuring seamless reassembly and maintaining the integrity and functionality of the equipment.
Secure Packaging and Fixing
The dismantled parts are carefully packaged and secured with professional fixtures to prevent any movement or damage during transport. We use protective materials to wrap these parts to avoid any potential bumps or scratches.
Efficient Loading and Shipping
After dismantling, we safely load the equipment and the dismantled parts onto containers or flatbed trucks, ready for shipment to the African destination. The entire process is carried out under strict safety standards to ensure the stability and safety of the equipment during transport.
通过拆卸大小臂,客户能够显著降低运输成本,同时确保设备在目的地能够快速、高效地重新组装并投入使用。对于预算紧张或希望最大化投资回报的客户来说,这种专业的拆卸和运输服务无疑是最佳选择。
By dismantling the boom and arm, clients can significantly reduce shipping costs while ensuring that the equipment can be quickly and efficiently reassembled and put into use at the destination. For clients with tight budgets or those looking to maximize their return on investment, this professional dismantling and shipping service is undoubtedly the best choice.
我们致力于为全球客户提供高质量的二手挖掘机以及全方位的物流解决方案。无论您在世界的哪个角落,我们都将以专业的态度和高效的服务,确保您的设备安全、准时到达。通过我们专业的拆卸和运输服务,您可以放心选择上海挖百万作为您的长期合作伙伴。
We are committed to providing high-quality used excavators and comprehensive logistics solutions to clients worldwide. No matter where you are in the world, we will ensure your equipment arrives safely and on time with a professional attitude and efficient service. With our professional dismantling and shipping services, you can confidently choose Shanghai Wabaiwan as your long-term partner.
上海挖百万二手挖掘机
网站:www.wabaiwan.com
邮箱:wabaiwan@qq.com
管理员
该内容暂无评论